OUR PROCESS

Here is what we do to optimize the performance of your Cooling Tower...

EXTEND THE LIFE OF YOUR UNIT

  • Remove corrosion and install the exclusive Evapliner protective membrane coating to all interior sheet metal surfaces. 

  • Replace old, corroded, worn panels. 

  • Reseal all sheet metal seams to eliminate leaks. 

REDUCE MAINTENANCE COSTS

  • Install jib booms and davits, ladders and platforms to reduce labor hours by providing easier access to your evaporative cooling equipment. 

  • Install electric water level controls to eliminate the expense associated with leaking mechanical make-up valves. 

  • Provide a service contract to perform all the routine maintenance as recommended by the evaporative cooling equipment manufacturer. 

IMPROVE THERMAL PERFORMANCE

  • Install new, more efficient wet deck and replace coil bundles for better thermal performance. 

  • Install new water distribution systems and recirculating 

  • Install new fan motors, sheaves, and fans to provide more airflow. 

ELIMINATE PROBLEMS

  • Replace old and worn shafts, bearings and wheels prior to failure. Emergency replacements can result in expensive repairs and unscheduled equipment downtime

  • Install new winterization equipment such as sump heaters, heat tape and pipe insulation. 

  • Install new filtration systems to reduce fouling in the equipment being serviced by the evaporative cooling units. 

GOODTOWER SERVICES

A Division of Chesapeake Systems, LLC.

7400 Coca-Cola Drive

Hanover, Maryland 21076-1394

 

Toll-Free: 800.559.2665

Office: 443.561.1600

Fax: 443.561.1601 | 443.561.1617

Email: gts@chesapeakesys.com

© 2018 by Chesapeake Systems LLC. All Rights Reserved

  • Grey Facebook Icon
  • Grey LinkedIn Icon
  • Grey Twitter Icon
  • Grey YouTube Icon